RAL unveils wireless firefighter

by | 15th February 2018 | News

Home News RAL unveils wireless firefighter

Ship & Boat International: eNews February 2018

ral1web

 

A collaboration between Canadian naval architect Robert Allan Limited (RAL) and tech specialist Kongsberg Maritime has boosted the former group’s plans for the development of a crew-free, remote-controlled fireboat.

 

RAL had previously hinted at the possibility of an unmanned firefighting vessel, capable of sparing human crew the level of risk associated with tackling blazes at ports, marinas or aboard other vessels, with proposals for its RAmora 2400, or Tele-Operated Workboat or Tug (TOWBoT), concept (see Ship & Boat International March/April 2016, pages 31-33 and March/April 2017, pages 10-12). In principle, a remotely piloted vessel would enable first responders to send the boat into the thick of the action – for instance, a site affected by fire or a suspected/confirmed CBRN attack – to neutralise the threat, before dispatching personnel to the scene. This approach would also safeguard against the risks of toxic smoke inhalation and unexpected explosions.

 

Now, RAL has come up with what it calls the RALamander 2000: a 20m fireboat equipped with FiFi 1 capability, and connected to either a manned fireboat or shore-based control room via Kongsberg’s high-bandwidth, wireless control and communications system.

 

Kongsberg claims that this system’s “versatile architecture” will “leave the door open to a range of autonomy levels”, in line with RAL’s originally stated plans for a potential autonomous firefighting craft. Additionally, Kongsberg explains, the system will offer “auto functions”, including dynamic positioning, water spray target holding and line protection – “where the RALamander automatically moves back and forth along a line while directing protective spray cover on shore structures or vessels”.

 

The RALamander 2000 will be equipped with three fire monitors, positioned on a retractable and height-adjustable mast. These will enable the vessel to throw a combined 2,400m³ (2.4 million litres) of water per hour (with optional foam). The vessel has been designed with a low profile, making it suitable for deployment in areas with low bridges, and to combat under-wharf/-marine fires. The vessel will also be fitted with a Grapnel Emergency Towing (GET) system, so that it can tow burning vessels away from the port and out of harm’s way.

 

 

 

Related Posts

News from the WA Section November 2024

News from the WA Section November 2024

RINA WA at Fremantle Maritime Day –– 2 November 2024 This year’s Fremantle maritime Day was held on Saturday 2 November 2024 at the Fremantle Passenger Terminal with more than 90 displays, free harbour boat rides, tours of tugs and emergency-response vessels, Border...

News from the Victoria Section November 2024

News from the Victoria Section November 2024

Technical Presentation –– 25 September 2024 Lars Holterud Aarsnes, Head, Maritime Advisory, South East Asia, Pacific and India, DNV Singapore, gave a presentation on Digital Twins via Zoom to a meeting at Navantia Australia in the Aquavista Tower, Docklands, and...

News from the Tasmania Section November 2024

News from the Tasmania Section November 2024

Technical Presentation –– 8 October September 2024  Graeme Elphinstone, Principal of Elphinstone Engineering, gave a presentation on Antarctic Expedition Programs to a meeting at Taylor Bros Marine in Hobart, Zoomed to the Australian Maritime College in Launceston,...

News from the SA&NT Section November 2024

News from the SA&NT Section November 2024

Technical Presentation –– 13 November  Martin Renilson, Adjunct Professor, Australian Maritime College, University of Tasmania, gave a presentation on Structural Integrity and Safety of Older Ships in a Seaway to meeting in the Engineering South Building at the...