Ghana trio to boost port support

by | 20th March 2019 | News

Home News Ghana trio to boost port support

Ship & Boat International: eNews March/April 2019

dd

 

Turkey’s Tor Group, which specialises in the construction of both commercial and pleasure craft, is aiming to deliver three Robert Allan Limited (RAL)-designed, RAstar 3300-class tugs to the Ghana Ports and Harbour Authority (GPHA) by the end of the year. The Istanbul-based fabricator is now four months into building the steel tug trio, and working hard to stick to "an aggressive timeline of delivery", RAL comments.

 

The urgency of this contract coincides with a notable, recent upsurge in cargo and container volumes in the West African state. For instance, between 2016 and 2017, the Ghanaian ports of Tema and Takoradi reported an upturn of 13% in cargo traffic (from 19.5 million tonnes to 22.1 million tonnes), accompanied by a 7% upswing in container traffic.This is prompting the need for more powerful tugboats with sizeable bollard pull (bp) capacity.

 

Each tug will feature a length of 32.8m, a breadth of 12.9m and a depth of 5.37m. Typical duties will include ship-assist work, firefighting and pollution response. Each boat will accommodate up to eight crew members and store up to 180,500litres of fuel and 35,800litres of water. Given that temperatures can reach 50oC in this part of the world, each tug will incorporate a climate-controlled wheelhouse and an air-conditioned switchboard room, to ensure that both personnel and electrical equipment remain cool during operations.

 

Each GPHA newbuild will be powered by a pair of Cummins QSK 95 engines, rated 2,685kW at 1,700rpm apiece, driving twin Rolls-Royce US2555 P30 azimuth thrusters. This arrangement will enable speeds of up to 13knots and a bp of at least 80tonnes, Cummins claims. A Rolls-Royce-manufactured hawser winch will be positioned on the fore of each tug’s deck, while a Mampaey quick-release towing hook on the aft will facilitate towing work.

 

Cummins will also fit each tug with a QSK 28-M engine, rated 1,190kW at 1,800rpm, which will be tasked with feeding the fire pump. This arrangement should lead to Bureau Veritas granting each tug the FiFi 1 Waterspraying class notation. Meanwhile, a Cummins QSB 7DM generator, producing 136kWe at 1,500rpm, will power each vessel’s hotel requirements.

 

 

 

 

Related Posts

News from the WA Section November 2024

News from the WA Section November 2024

RINA WA at Fremantle Maritime Day –– 2 November 2024 This year’s Fremantle maritime Day was held on Saturday 2 November 2024 at the Fremantle Passenger Terminal with more than 90 displays, free harbour boat rides, tours of tugs and emergency-response vessels, Border...

News from the Victoria Section November 2024

News from the Victoria Section November 2024

Technical Presentation –– 25 September 2024 Lars Holterud Aarsnes, Head, Maritime Advisory, South East Asia, Pacific and India, DNV Singapore, gave a presentation on Digital Twins via Zoom to a meeting at Navantia Australia in the Aquavista Tower, Docklands, and...

News from the Tasmania Section November 2024

News from the Tasmania Section November 2024

Technical Presentation –– 8 October September 2024  Graeme Elphinstone, Principal of Elphinstone Engineering, gave a presentation on Antarctic Expedition Programs to a meeting at Taylor Bros Marine in Hobart, Zoomed to the Australian Maritime College in Launceston,...

News from the SA&NT Section November 2024

News from the SA&NT Section November 2024

Technical Presentation –– 13 November  Martin Renilson, Adjunct Professor, Australian Maritime College, University of Tasmania, gave a presentation on Structural Integrity and Safety of Older Ships in a Seaway to meeting in the Engineering South Building at the...